Temperature, humidity and vibration combined test chamber
Technical Specifications
|
Model |
TAHPZ-150L |
TAHPZ-225L |
TAHPZ-408L |
TAHPZ-800L |
TAHPZ-1000L |
|
|
Control System |
Balanced temperature and humidity control system |
|||||
|
Temp range |
-70℃~150℃ |
|||||
|
Humidity range |
20℃~98%RH |
|||||
|
Temp deviation |
±3.0℃ |
|||||
|
Humidity deviation |
±3%R.H(≥75%R.H)/±5%R.H(<75%R.H) |
|||||
|
Heating up time |
-70℃~150℃ within 60minutes |
|||||
|
Cooling time |
20℃~-70℃ within 75 minutes |
|||||
|
Inner size(cm) |
W |
50 |
50 |
60 |
100 |
100 |
|
H |
60 |
75 |
85 |
100 |
100 |
|
|
D |
50 |
60 |
80 |
80 |
100 |
|
|
Inner materials |
SUS304 Advanced stainless steel |
|||||
|
Outer materials |
Cold rolled steel plate surface treatment by electrostatic spraying or SUS304 high-grade stainless steel |
|||||
|
Insulation material |
High density polyurethane foam and glass fiber |
|||||
|
Cooling system |
Air cooled/water-cooled, single-stage/stacked, fully enclosed/semi enclosed compressors, environmentally friendly refrigerants (R404a/R23) |
|||||
|
Controller |
LCD color touch screen, Chinese/English display, program, communication function |
|||||
|
Protector |
Non fuse switch, compressor overpressure, overheating, overcurrent protection, overtemperature protection, fan overload protection, fuse, dry burning machine protector, water shortage protection switch, fault warning system, alarm |
|||||
|
Standard accessory |
Three-layer vacuum observation window, test hole, experimental stand, interior lighting, indicator light, mobile work wheel, humidification water tank, power cord, communication interface |
|||||
|
Vibration table |
Vertical and horizontal options can be selected according to user requirements |
|||||
|
Heater |
High quality nickel alloy heater |
|||||
|
Blower |
Centrifugal fan |
|||||
|
Power Supply |
AC380±10% 50HZ |
|||||
|
Environmental temperature for use |
5℃~35℃ |
|||||
|
Power Supply |
AC380±10% 50HZ |
|||||
Key Highlights
Application
Compliance & Standards
FAQ
-
1.How to ensure the sealing performance of the three-in-one test chamber
We are equipped with a special high-strength silicone flexible connection cover and a customized heat-insulating blind plate, which can effectively absorb high-frequency vibrations. Moreover, they remain uncracked and leak-free even at a -70℃ low temperature environment, ensuring stable and reliable sealing and shock resistance performance. -
2.How can we prevent the heat generated by the vibration table from interfering with the temperature of the test chamber?
The equipment adopts an independent cooling air duct and insulation layer design, which can effectively prevent the heat generated by the vibration table motor from entering the test chamber. -
3.What are the requirements for the laboratory floor by the equipment?
Due to the strong vibration stress, an independent foundation (ground pit) or a large air cushion vibration isolation device is usually required. We can provide free foundation construction drawings.

Home




